PROJECT NAME LOCATION CLIENTS COMPLATIONS
Soil Investigation proyek A2 Hotel BatamBatamPT. Raflesia Global2020
Soil Investigation Proyek Ferry Terminal Marina BengkongBatamPT. Aesler Group International2020
Topography Survey Proyek Ferry Terminal Marina BengkongBatamPT. Aesler Group International2020
Soil Investigation proyek Nagoya Tamrin City (NTC)BatamPT. Sarana Bakti Persada2020
Soil Investigation proyek waterfront marinaBatamCalypso Construction Management PTE. LTD2020
Soil Investigation Chemical Plant Pindo Deli 2 KrawangJawa BaratPT. Pindo Deli2019
Soil Investigation Laman Mining, KetapangWest KalimantanPT. Laman Mining2019
Soil Investigation Fly Over CakungJakartaPT. PP2019
Soil Investigation Tol Serpong-BalarajaSerpongPT. Wijaya Karya (Persero)2019
Soil Invesigation Jembatan Penggaron Ruas TOL UngaranSemarang-BawenPT. Trans Marga Jateng2019
Soil Investigation Pengembangan Pulau KongsiKepulauan SeribuPT. Panorama Pulau Seribu2019
Soil Investigation Harbour Road II KemayoranJakartaPT. Wijaya Karya (Persero)2018
Soil Investigation TOL Japek II (Elevated)Bekasi-CikampekWaskita-Acset KSO2018
Soil Investigation Seaport PT OKI, Ogan Komering IlirSumselPT. OKI Pulp and Paper2018
QC Nuclear Density Test Pengurugan Lahan Kawasan Industri TerpaduSemarangPT. Gemilang Bentara Nusa2018
Soil Investigation PT. Nutrindo JogashimaCikarangPT Nutrindo Jogashima2018
Penyelidikan Tanah Hotel Mercure Tanjung TinggiBelitungPT. Biliton Asri Pratama2017
Soil Investigation Pelabuhan Executive Port MerakBantenPT. PP2017
Soil Investigation Pelabuhan Executive Port BakauheniLampungPT. PP2017
Soil Investigation Citra Plaza Nagoya City Center 2 Tower @ 35 floorsBatamPT.Citra Seraya Supremnusa2017
Pumping Test for Manyar Kartika ApartementSurabayaPT.Asa Bangun Investama2017
Engineering Improvement Slope Stability Soroako Nickel Production Facility, Luwu TimurSulawesi SelatanPT. Lycon Asia Mandiri2017
Soil Investigation LRT Jakarta Project Corridor 1 (Phase 1) Klp Gading-VelodromeJakartaPT. Wijaya Karya (Persero)2016
Soil Investigation High Speed Railway Jakarta - Bandung ProjectBekasi-Bandung BaratPT. Wijaya Karya (Persero)2016
Soil Investigation Power Plant Minihydro Cidurian Project BogorPT. Hydro Alam Lestari2016
Soil Investigation Power Plant Minihydro Ciberang ProjectBogorPT. Hydro Alam Lestari2016
Soil Test Apartement The Smith Soho (30 floor+ 3 Besment), Alam SuteraTangerangPT. Triniti Dinamik2016
Soil Investigation High Speed Railway Jakarta - Bandung ProjectKemayoran-BekasiPT. KCIC2016
Soil Investigation for GOA The Edge 2 Project, PecatuBaliPT. Bali Selaras Indah Sejati2016
Soil Investigation Apartemen and Hotel Meisterstand Batam Phase 1 Project (4 Tower 40 Floors)Batam CenterPT. Pollux Barelang Mega Super Blok2016
Soil Investigation Australian International School Building, DenpasarBaliPT. Kreistef Mega Sejahtera2016
Soil Investigation and Topographic Survey for Superblock Meisterstadt Batam Pollux HabibieBatam IslandPT. Pollux Barelang Mega Super Blok2016
Soil Investigation for Pulau G Brigde Pluit City (Onshore &Offshore), PluitJakartaPT. Wijaya Karya (Persero)2016
Soil Investigation and Topographic Survey forTunnel Pre Design Stage of Paro - Kulu Relocation Road ProjectAcehMinistry of Public Work2015
Geotechnical Investigation, Design and Built of Soil Improvement for Foundation Repair at Hotel Ibis ManadoNorth SulawesiPT Batavia Prasarana Mitranda2015
Soil Investigation for Development of Sewerage System Batam Area WWTP, Pipeline and Pumping StreetBatamSunjin Engineering & Architecture Co. Ltd2015
Soil Investigation and Topography Survey for Hotel and Resort DevelopmentLagoi - BintanPT. Bintan Pelangi Resort2015
Soil Investigation and Topograhic Survey Proyek Apartemen Podomoro Golf View CimanggisDepokPT. Graha Tunas Selaras2015
Soil Investigation During Design Scheme Phase for "6 Ruas Tol Layang DKI Jakarta " Project, Semanan to Sunter SectionJakartaPT Arkonin2015
Soil Investigation for Development of Sewerage System Batam Area WWTP, Pipeline and Pumping StreetBatamSunjin Engineering & Architecture Co. Ltd2015
Soil Investigation During Design Scheme Phase for "6 Ruas Tol Layang DKI Jakarta " Project, Semanan to Sunter SectionJakartaPT Arkonin2015
Soil Investigation for Development of Sewerage System Batam Area WWTP, Pipeline and Pumping StreetBatamSunjin Engineering & Architecture Co. Ltd2015
Soil Improvement Design dengan Jet Grouting untuk Tunnel Sodetan Sungai Ciliwung - BKLJakarta TimurPT Wijaya Karya2015
Geotechnical Investigation, Design and Built Permeation Grouting untuk Perbaikan Settlement Pondasi Greenbay Baywalk Sodetan Sungai Ciliwung – BKLGreenbay ApartmentJakarta UtaraPT Wisesa2015
Soil Investigation of The Proposed Kayaba HC, Factories and Bridges of PT Sanyo Jaya and Other Industrial AreaKarawang - West JavaPT Nippon Konpo Indonesia2014
Geotechnical Investigation, Design and Built for Repairing Existing Slab / Foundation of Tank, Pipe Rack and Other Structures (Soil Investigation, Foundation Design and Construction by Various Suitable Improvement Method, i.e. Grouting in Soil, Underpinning, Injected Pile and Other Systems) at PT IKPP Plant Area in PerawangRiau PT IKPP2014
Soil Investigation and Topograhic Surveyfor Veasna Beachfront CondotelJimbaran - BaliPT Menara Batakan Jimbaran2014
Soil Investigation for Sango SuryaciptaBandar LampungPT PP Taisei Indonesia Construction2014
Sub Bottom Profiling Survei di Pulau SambuBatamPT. Wijaya Karya (Persero)2014
Bathymetri Survey dan Hidro Oceanografi Survei Proyek Jembatan 1 Tanjung PinangKepulauan RiauPT. Wijaya Karya (Persero)2014
Topography Survei for Bintang Lagoi ResortBintanPT StarLuxe Development Indonesia2014
Geotechnical Investigation, Design and Built Injection Pile for Foundation Repair at Hotel Artotel, ThamrinJakartaPT Altar Filadelfia2013
Geotechnical Investigation for Proposed Pulau FReclamation AreaNorth JakartaPT Agung Dinamika Perkasa2013
Soil Investigation for Serangan IslandBaliPT Bali Turtle Island Developmet2013
Soil Investigation for Land Reclamation Area in Ambon and Tanjung BungaMakassarLippo Group2013
Quality Control During Site Filling for Lion Air Maintenance Facilities in Bandara Hang Nadim, Tanjung UncangBatamPT Lion Mentari Airlines2013
Engineering, Procurement and Construction (EPC) Work and Soil Investigation for Foundation and Retaining Wall (Dewatering, Bored Pile, Soil Nailing And Shotcreting) for The Himana Condotel ProjectJimbaran - BaliPT Nusa Raya Development2013
Soil Investigation for Gresik Landfill Project (Onshore / Nearshore)Gresik - East JavaPT Van Oord2013
Topographic Survey for Development of Phase 3Karawang - JabarPT Indotaisei Indah Development2013
Quality Control During Site Filling for Plant AreaTanjung Uncang- BatamPT Caterpillar Indonesia2012
Geotechnical Investigation for Green Bay Reclamation AreaNorth JakartaPT Kencana Unggul Sukses2012
Topography Survey and Earthworks Quality Control During Penyiapan Infrastruktur Jalan Masuk Lokasi LMB 8, Cluster Pengeboran LMB - 8 Proyek Geothermal Lumut BalaiSumatera SelatanPT Pertamina Geothermal Energy2012
Soil Investigation for SohoPodomoro City Tower Office (43 Storeys Building)West JakartaPT Agung Podomoro Land, Tbk2012
Soil Investigation and Topography Survey at Bandara Hang NadimBatamPT Lion Mentari Airlines2012
Geotechnical Investigation, Design and Built for Repairing Existing Slab / Foundation of Tank, Pipe Rack and Other Structures (Soil Investigation, Foundation Design and Construction by Various Suitable Improvement Method, i.e. Grouting in Soil, Underpinning, Injected Pile and Other Systems)JambiPT LRPP2012
Design and Built Curtain Wall Grouting using PIP method for Bajulmati Dam Construction, BanyuwangiEast JavaPT. Brantas Abipraya2011
Soil Investigation at Teluk Paku Tg. Balai KarimunKepulauan RiauKeller Foundation (S E Asia) Pte Ltd2011
Geotechnical Investigation, Design and Built Soil Improvement untuk Penanganan Sementara Longsoran Lereng Gedung Atlit Putri, Wisma Atlet HambalangBogorPT. Adhi – Wika JO2011
Engineering, Procurement and Construction forSoil Improvement and Dewatering Work During Excavation and Construction of Water Treatment Plant (WTP)East JavaPT Java PacificFactory2011
Soil Investigation for Upgrading Unit Pelumas Pertamina (UPPJ)JakartaPT Krakatau Engineering2011
Soil Investigation Work at McConnel DowellBatamPT. McConnell Dowell Services2011
Geotechnical Investigation, Design and Built Soil Improvement untuk Penanganan Kebocoran H2S di Wellpad Geothermal UlubeluLampungPT. Pertamina Geothermal Energy2011
Topografi Survey Work For French EmbassyJakarta PusatFrench Embassy2011
Pekerjaan Pengukuran (Topografi) di Jl. Raya Serang - PandeglangBantenPT Bank Indonesia (BI)2011
Soil Investigation for Barelang I BridgeBarelang - RiauPT. Wijaya Karya (Persero)2011
Quality Control During Earthworks Pekerjaan Pembuatan Jalan Masuk LMB2 dan Lokasi LMB 2 Pertamina Geothermal EnergySumatera SelatanPT Tunas Jaya Pratama2010
Geotechnical Design, Soil Investigation, Instrumentattion and Topographic Survey Pekerjaan Pembuatan Jalan Masuk LMB2 dan Lokasi LMB 2Sumatera SelatanPT Pertamina Geothermal Energy,2010
Soil Investigation Proyek Irigasi Ciliman Pendeglang Package LMSS:ICB, Civil Work of Head Work in Main Canal Irigation System Ciliman Irigation Sub ProjectCiliman - West JavaPT Adhi Karya (Persero) Tbk2010
Soil Investigation for Casablanca FlyoverKuningan - JakartaPT Adhi Karya (Persero) Tbk2010
Soil Investigation for Pangeran Antasari FlyoverSouth JakartaPT Hutama - PT Nindya JO2010
Penyelidikan Tanah di Kawasan Nongsa-Batam, Topografi dan BathymetryNongsa - BatamPT Bank Indonesia (BI)2010
Design and Build for Dewatering Work at PLTG Tanjung Priok ProjectNorth JakartaPT Wijaya Karya (Persero) Tbk2009
Design and Build for Dewatering Work at Paiton3 Expansion Project Unit 3 & 4 Coal Fired Power PlantJakartaTOA Corporation2009
Soil Test dan Instumentasi Proyek Perbaikan Longsoran di Lokasi LMB - 3 Proyek Geothermal Lumut BalaiSumatera SelatanPT Pertamina Geothermal Energy2009
Feasibility Study, Geological Survey and Topographic Survey for Coal Mine Exploration in SinjaiSouth SulawesiPT. Daya Sentosa Sejahatera2008
Soil Investigation of 23 KM Transmission Line Dente - CPB (Brantasena)LampungPT Central Daya Energi2008
Soil Investigation for Korindo Bridge and Jetty at Kumai and Semanggang VillageCentral KalimantanPT Korintiga Hutani2008
Soil Investigation, Topography, Bathymetric and Hydrological Survey for 2 x 10 MW CFSPP Larantuka and LabuhanEast Nusa TenggaraPT Manunggal Engineering (ME)2008
Basic and Detailed Engineering Design for The Proposed Coal Terminal at Pulau Baai, for Bengkulu Coal Transportation Development ProjectBengkuluPT Pathaway International2008
Soil Investigation at Pulau Baai Port For Bengkulu Coal Transportation Development ProjectBengkuluPT Pathaway International2008
Topography at Karimun Area I/II, Oil TankingSingapuraAsia Pacific Pte Ltd2008
Bathymerty and Topography Surveys, and Secondary Data Collection and Analysis Pulau Baai PortBengkuluPT Pathaway International2008
Topography & Bathymetry Pekerjaan Pembuatan Jalan Masuk LMB 3 dan Lokasi LMB Sumsel, Pertamina Geothermal EnergySumatera SelatanPT Pertamina Geothermal Energy & PT Tunas Jaya Pratama2008
Soil Investigation, Topography, Bathymetric and Hydrological Survey for 2x10 MW CFSPP Labuhan Bajo - West Flores and CFSPP Larantuka - East FloresEast Flores PT Manunggal Engineering2008
Soil Investigation & Analysis Service in Matak Base AreaMatak RiauConoco Philips Indonesia Inc. Ltd2007
Soil Investigation for Coal Fired Plant ProjectTanjung Sengkuang - BatamPT Graha Citra Kita2007
Soil Investigation, Pumping Test, Seismic Down Hole Test and Site Spesific Response Analysisi for Central Park Project Mixed Used DevelopmentJakartaPT Tiara Metropolitan Jaya2007
Onshore and Offshore Soil Survey for Coal Fired Power Plant ProjectEast KalimantanPT Tria Talang Mas2007
Environmental Impact Analysis for PLTU Labuhan Angin, SibolgaNorth SumateraPT Wijaya Karya2007
Engineering, Procurement and Construction forSoil Improvement in Sampoerna Medan Warehouse and Slope Protection in Surabaya FactoryMedanPT HM Sampoerna2007
Design and Build for Dewatering Work During Construction of PLTGU Labuhan Angin - SibolgaNorth SumateraPT Wijaya Karya2007
Topography Survey And Soil Investigation for Telkomsel BuildingBanda Aceh and PekanbaruPT Atelier Enam 6 Struktur2007
Topographic Survey at Simatupang Office BuildingJakartaPT JGC Indonesia2007
Geological and Soil Mechanical Investigations for Design Review of PIRIMP Package - IVSouth SumateraNippon Koei Co., Ltd and Associate2006
Soil Investigation, Bathymetry and TopographyySurvey for PLTU Teluk NagaTangerang - BantenPT Rekadaya Elektrika2006
Soil Investigation for Oil Storage Facility, Bintan Island ProjectBatamTWC Tiong Woon Oil & Gas Service Pte Ltd2006
Design and Rehabilitation for access road Bukit Mata KucingBatamPT Ardhinusa Mitratel2006
Topography and Bathymetry Survey and Soil Investigation for PTLU Teluk NagaTangerang BantenPT Rekadaya Elektrika2006
Topography Survey, Soil Investigation, Geoelectric Survey for Villa Uluwatu Desa Pecatu, Kec Kuta BaliBaliPT Orang Tua Group2006
Soil Investigation for Monorel Plan ProjectJakartaPT Adhi Karya2005
Soil Investigation for Irrigation Way Curup ProjectEast LampungPT Adhi Karya (Persero) Tbk2005
Provision of Soil Survey Services for South Sumatra - West Java Pipeline Project Package 2South SumateraPT PGN - Nippon Steel Corporation2005
Pumping Test, Dewatering Design and Dewatering Operationfor Pacific Place Project, SCBDJakartaPT. Metropolitan Mulia Persada2005
Environmental Impact Analysis Assessment for JORRI, Ulujami - Pondok IndahJakartaPT Jasa Marga2004
Design, Dewatering System Installation and Operation During Construction of Cilacap Steam Power PlantCilacapPT Wijaya Karya2004
Soil Investigation for Daan Mogot Fly Over Project, 25 PiersWest JakartaPT Waskita Karya Divisi II2003
Bathymetric Survey and Topographic Surey at Shiplifting Yard Muara Baru UjungJakartaPT Proskuneo Kadarusman2003
Environmental Impact Analysis Assessment for TV Tower Surabaya (200m) & Semarang (120 m) PT Televisi Media Indonesia (Metro TV)Surabaya - SemarangPT Televisi Media Indonesia (Metro TV)2002
Topography Survey for Bukit SentulBogor - JabarPT Akipuri Intranasional2002
Topographical Survey Bali Intercontinental ResortBaliPT Citra Jimbaran Hotel2002
PECIKO Field Development Project - Phase III Onshore Geotechnical Survey, PecikoJakartaTotal Indonesia2001
Geotechnical Engineering Consultancy Service to Support Offshore & Geophysical Site Investigation, Devon Energy Companies in IndonesiaJakartaDevon Energy Companies2001
Feasibility Study for SUTET OECF & KE. III (SUTET 500 kV Depok Incomer II), Gandul & BalarajaDepok - JabarPT PLN (Persero)2000
Pile Drilling Monitoring Service Anoa Gas Export ProjectJakartaNippon Steel Corporation2000
Geoelectric Survey and Geohydrology Map (ISDP) at Pekan Tua, Teluk Kiambang, Sei Mumpa & Sei Rukan, Indragiri Hilir, DPU Proyek Pengairan Daerah Rawa (P2DR)RiauPUPR1999
Installation & Monitoring of Geotechnical Instrumentation for Manggar DamBalikpapan - KaltimPT Nindya Karya Balikpapan1999
Soil Investigation and Topographic Survey for PLTD Tanjung SengkuangBatamPT. PLN (Persero)1999
Soil Investigation and Bathymetric Survey (1000 x 10 m2) for Musi River ProjectPalembang - South SumateraPT Wika Beton1999
Design, System Installation and Dewatering Operation During Construction of Bali International Airport Project - BaliBaliPT Kaliraya Sari1999
Dewatering Design and Construction for Matakabo Dam ProjectMalukuPT Waskita Karya IV Denpasar1999
Feasibility Study for Barru Street (South Sulawesi, Poso (Midle Sulawesi)Semarang (Central JavaPT Jasa Marga1998
Soil Boring Works for Jack Up Drilling Site at Berau Block an Associated Area, Berau - East Kalimantan, Atlantic Rickfield BerauEast KalimantanARCO - Somesha Geosciencers Pte Ltd1997
Soil Investigation for JORR E1 Stage 2 Project, Kampung Rambutan - Cikunir Fly Over, Fly Over Review DesignJakartaPT Nusa Buana Kusuma1997
Soil Investigation and Foundation Design for Artha Graha Building ProjectSCBD - JakartaPT Danayasa Arthatama1997
Soil Investigation for SCBD Building Lot II ComplexCBD - JakartaPT Danayasa Arthatama1997
Soil Investigation & Topographic Survey for Transmission Line Mapping SUTT 150 kV Singkawang - Sambas, Singkawang - Bengkayang - Seluas Perbatasan, East kalimantanKalimantanPT PLN (Persero)1997
Design for KPKN V Building, Jakarta Jl. TB. Simatupang (Outer Ringroad), South Jakarta, Prasarana Fisik Kantor Pusat Dit. Jend. Anggaran Jakarta Departemen Keuangan RIJakartaDepartemen Keuangan1997
Detail Design for Telkom Building Project Division Ris Ti 97BandungTelkom1997
Geotechnical Survey in Irian JayaIrian JayaBritish Gas International1997
Geotechnical Investigation at Muara Karang & Tanjung Priok ORFTanjung Priok - JakartaARCO1996
Soil Investigation, Dewatering Design and Dewatering Work During Basement Excavation and Costructrion for Taman Anggrek Mall (8 towers in 6.5 ha area)West JakartaPT Mulia Griya Indah1996
Survey, Plotting and Stacking Out Route SUTT 150 kV and Soil Investigation at Duri - Bagan Batu ProjectRiauPT. PLN (Persero)1996
Soil Investigation for Way Pedada Irrigation Project Lampung, South Sumatera, Public Work Department - Water Resource Conservation & Development ProjectSouth SumateraDirectorat of Irigation1996
Topography and Site Grading Sektor D & G at Bukit Indah City - Purwakarta West JavaPurwakartaPT Besland Pertiwi1996
Soil Investigation and Instrumentation for ITC Cempaka Mas Jl. Cempaka PutihJakartaPT. Duta Pertiwi1996
Pre Feasibility Study for PLTA Semangko 3 LampungLampungPT PLN (Persero)1996
Soil Investigation for Design factory and office building of Lippo City CikarangCikarang - West javaNinz Pasific1995
Field Investigation Works for the Development of Bintan Industrial Estate at Loban Bintan IslanBintanPT. Surya Bangun Pertiwi1995
Hydrographic and Marine / Land Investigation on Bintan Beach International ResortBintanSembawang Industrial Pte Ltd1995
Site Grading Design for Sector D & G - N at Bukit Indah City AreaCikampekPT. Besland Pertiwi1995
Field Investigation for Pre Feasibility Study of Bone HEPP North Sulawesi Package IIINorth SulawesiPT PLN (Persero) PISFP1995
Soil Investigation for Instrument Installation, Quality Control Monitoring Belawan Steam Power Plant 3&4MedanPT Mega Elta1995
Field Investigation Pre Feasibility Study for PLTU BatamBatamPT PLN (Persero) PISFP1995
Feasibility Study, RKL, RPL, Resettlement Plan and Aerographic for PLTU Mulut TambangBanjarmasinPT PLN (Persero) PISFP1995
Feasibility Study and Resettlement Plan for Two Hydro Power Schemes PALU-3Cetral SulawesiPT PLN (Persero)1995
Dewatering Work for Bank Indonesia Gd. C Package - I ProjectJakartaPT Wijaya Karya1995
Field Investigations for Feasibility Study of Ujung Pandang Coal Fired Steam Power Plant Dev. ProjectMakassar - South SulawesiNewjec Inc1994
Geotechnical Services for Tanjung Api -Api and Kilang Musi Pipeline, PERTAMINASouth SumateraPERTAMINA1994
Pre Feasibility Study for PLTA Bone (Package - III)Nort SulawesiPLN - PISFP1994
Design, Dewatering System Installation and Operation During Construction of Dukuh Atas Underpass ProjectJakartaPT Jaya Konstruksi MP1994
Hydrographic and Marine / Land Investigation on Bintan Beach International ResortBintanSembawang Industrial Pte Ltd1993
Offshore and Marine Survey for Taihsi Harbour Project Taiwan (Phase - II)TaiwanUnited Surveyor Co - Ltd Singapore1993
Add Site Study PLTU Mulut Tambang Banjarmasin (Package III)BanjarmasinPT PLN (Persero) PISFP1993
Site Study and Investigation Survey Include Andal for Minemouth Steam Power Plant Project PLTU Bukit Asam Stage IISouth SumateraPT PLN (Persero) PISFP1993
Site Study Including Geotechnical Investigation for Banjarmasi Mine Mouth Steam Power Plant ProjectBanjarmasin - South KalimantanPT PLN - PISFP1992
Onshore Drilling Surabaya Side (2 Km2) and Madura Side (1 Km2) Geotechnical and Feasibility Study for Surabaya Madura Bridge ProjectSurabayaPT. Virama Karya - BPPT1992
Offshore and Marine Survey for Taihsi Harbour Project Taiwan (Phase - I) and parcel A - 11BintanUnited Surveyor Co - Ltd Singapore1992
Design Engineering at Karawaci Tangerang, Banten - Indonesia, TangerangWest JavaSunkyong Engineering dan Construction Ltd1992
Engineering Design, Tender Document and Bidding Process for "Jalan Non Status Special Program II" in North Sumatera West Kalimantan, Central Kalimantan, East Kalimantan and South Sulawesi with Total Lengh 230.00 km, Kalimantan, Proyek Perencanaan Teknik Jalan, Public Work Department Dirjen Bina Marga Direktorat Bina TeknikNorth SumateraBina Marga Direktorat Bina Teknik1992
Site Study PLTU Mulut Tambang Banjarmasin (Package III)BanjarmasinPT PLN (Persero) PISFP1992
Topographic Survey & Soil Investigation ISP Polyester Filamen Yarn Plant ProjectCilegon - West JavaSunkyong Corporation1991
Geotechnical for Bali Power StudyBaliPLN - PISFP1990
Geotechnical Investigation and Topographic Surveyof Judgement Study and Investigation on Deteioration of Existing Barrage, Pamarayan BarrageWest JavaNippon Koei and Association with PT Indra Karya and PT PAC1989
The Provision of Onshore and Offshore Geotechnical Service around Pagerungan IslandEast JavaPT Komaritim - ARCO1989
Building Detail Design For 80.000 MTPA EO/EG ProjectJakartaPT Yasa Ganesha Pura1989
Feasibility Study for Banjarmasin Coal Fired Steam Power Plant Project Banjarmasin PLN-Ewbank Preece Ltd. In associaterBanjarmasinPT Indra Karya - PT Pratama Widya1989
Soil Investigation at Tarum Jaya Canal IntakeWest JavaPT. Persada Adhi Cipta1988
The field Investigations for the Palu - 3 Feasibility Study for Two Hydro Power Scheme in Java & SulawesiCentral SulawesiPT Yodya Karya - PT PLN1988
Design of Site Engineering for ITS at SukoliloSurabayaITS1988
Topographic Survey for Field Investigation of the Palu-3 Feasibility Study for Two Hydro Power Schemes in Java & SulawesiJava & SulawesiPT. Yodya Karya, Coyne et Bellier & PLN1988
Topographic Survey Pertamina Exor Project at Besuki & PacinanPacinanJGC CORP & SIR THOMAS HALCROW1988
Aerial Photography, Mapping, Identification of Landholding of Jrantunseluna River AreaJakartaPT Persada Adhi Cipta1988
Soil Investigation at STDP Petro Central Padang, West Sumatera, Bangkok Anlagen, GermanWest SumateraSTDP Petro1987
Soil Investigation for NS Link Project, Cawang Tanjung Priok, Jakarta, PT. Hutama Jaya Yala & Citra Marga Nusaphala PersadaJakartaPT. Hutama Jaya Yala1987
Soil Investigation for Tanjung Pandan Diesel Power Plant (PLTD) ProjectBatamPT PLN PISFP & PT PAC1987
Soil Investigation, Instrumentation and Dewatering Design and Services for Basement Construction of Plaza Indonesia BuildingJakartaSangyong Construction1987
Soil Investigation, Quality Control and Soil Behaviour (Lateral, Vertical, Pore Pressure) Monitoring During Site Reclamation for PT PLN's Belawan Steam Power Plant phase 3 & 4 AreaBelawan - North SumateraPT Mega Elta1986
Design Road Trace for "Transmigrasi" at Bengkulu, NTB, South Sumatera, NTB, Bengkulu, South Sumatera, DEPARTEMEN TRANSMIGRASISouth SumateraDEPARTEMEN TRANSMIGRASI1986
Pre Feasibility Study for Gunung Salak Geothermal Power PlantWest JavaPerusahaan Umum Listrik Negara1986
Sub. Project Rencana Bagian Wilayah Kota (RBWK) at Kec. Pulogadung, Cempaka Putih and Matraman JakartaJakartaPemerintah Daerah Khusus Ibukota Jakarta1985
Detail Study Management Pengolahan Kembali Limbah Padat at Batam Island, Batam, Badan Pelaksana Otorita BatamBatamBadan Pelaksana Otorita1985
Hydrogeologi for Feasibility Study PLTU PaitonEast JavaPT PLN (PERSERO) PISFP1985
Engineering Design PLTM Lubuk Gadang III West SumateraWest SumateraPLN - PISFP1984
Showing entries (filtered from total entries)
Office & Laboratory

Widya Griya
Jl. Kelapa Buaran PLN No.92 A-D
Cikokol, Tangerang, 15117, Indonesia

Integrated Office Batam

Komp. Era Century Park D2
Bengkong Sadai, Batam
Batam - 29461, Indonesia

Contacts

email headoffice@pratamawidyaengineering.com
local_phone (+62 21) 557 82 407 / 418
local_printshop (+62 21) 557 01567

email pwebatam@pratamawidyaengineering.com
local_phone (+62 778) 451 035 / 036